latest projects

latest projects (3)

پنج شنبه, 21 -2664 ساعت 11:02

Persian Gulf Star Refinery Project

نوشته شده توسط

E.G.P. Co. is honored to manufacture and procure more than 700 thousand m2 of Aluminum Jacketing and insulation ancillaries associated with the major ongoing refining project in Iran in accordance with the NIOC’s standard (IPS).

Construction of Persian Gulf Star refinery is the first refinery designed based on gas condensate feeds with capacity of daily 360,000 gallons from 2006 in a field of 700 Ha in Bandar Abbas which would utilized in case of on time supply of financial resources to up to March 2018.

Utilizing Persian Gulf Star Refinery, Iran is now self-sufficient in terms of petrol and diesel and this refinery will become one of 5 main exporters of petrol in Middle East.

Ebdaagaran Padide Company with more than 16 years of excellence plays significant role in insulator protection productions in completion of construction and utilization project of Persian Gulf Star.

 

پنج شنبه, 02 فروردين 777 ساعت 06:09

The refinery of Phase 19 of South Pars gas field

نوشته شده توسط

One of the largest contracts of E.G.P. Co. has been to supply more than 300,000 m2 of Aluminum Jacketing and insulation ancillaries for Phase 19 of South Pars Gas Field Development Project (according to the NIOC’s standard (IPS)).

The onshore establishments and facilities of Phase 19 border the Persian Gulf in Tumabk region (approximately 210 km East-South of Bushehr Port) in an area measuring about 218.5 hectares, between the refineries of Phase 11 and 12 of South Pars, in Pars 2 Energy Economic Special Zone. Phase 19 includes drilling of 15 wells on three wellhead platforms. The gas and condensates extracted from the said wells will be transferred to the Onshore facilities in Tumbak region using 2 submarine gas pipelines measuring approximately 129 Km in length. In the Onshore refinery, the sour gas, condensates, water and other impurities will be collected from offshore facilities and upon separation; they will be refined into intended materials. Upon sweetening the sour gas in 4 rows of gas processing, sweet gas is injected into Pipeline VI of the National Gas Grid. The condensate separated in the refinery is exported using submarine pipeline and SPM.

The refinery started work in April 2017.

Phase 19 development of South Pars is set to produce 50 mcm/d of sweet gas, 75,000 b/d of gas condensate, 400 tons a day of sulfur, 1.05 million tons a year of liquefied petroleum gas and one million tons a year of ethane.

دوشنبه, 20 شهریور 1396 ساعت 16:56

The refineries of Phases 13 & 14 of South Pars gas field

نوشته شده توسط

The contract for the development of phases 13 & 14 of South Pars project has been signed between Mapna Company as employer and E.G.P. Co. as one of the main suppliers of Aluminum Jacketing and insulation ancillaries.

Upon commissioning, each of the phases 13 and 14 will be capable of producing 50 million cubic meters of sweet gas, 77 thousand of gas condensates, and 2900 tons of liquefied gas per day. Furthermore, multiple folds of added value will be gained taking into account daily production of 2750 tons of ethane for petrochemical complexes.

Mapna Company is engaged in engineering, procurement, construction, erection and running of compressor and metering station, sulfur recovery and granule making units, power distribution, steam generation and distribution unit, fuel supply systems, supply and distribution of service and precision tool air, production and storage of nitrogen, facilities for the transfer of sea water, booster pump, water packages, diesel, cooling water package, treatment of water and waste water, chemicals and sulfur storage tanks and electrical systems.

INNOVATOR AND PIONEER MANUFACTURER OF INSULATION POLYKRAFT, SUPERPOLYKRAFT AND POLYSURLYN JACKETING IN IRAN

MANUFACTURER OF THREE-LAYER POLYETHYLENE AND POLYSURLYN FILMS

MANUFACTURER OF SEAMLESS ALLOY STEEL TUBES

 

کلیه حقوق این سایت متعلق به شرکت ابداع گران پدیده بوده

و هر گونه کپی برداری از آن قابل پیگرد قانونی است.
Copyright © 2023 E.G.P. Co.

طراحی سایت توسط نونگار